Info-work

  • Info-work
Share

This section contains information on current construction work in Dollard-des-Ormeaux as well as work planned for 2022. Dates may vary since several factors, such as the weather, can have an impact on the duration of the work.

All possible measures are taken to minimize inconveniences. The City asks residents to respect traffic signs near construction sites.

We thank all residents and motorists for their patience and cooperation!

Planned works

Reconstruction of the pavement, curbs and sidewalks

Street
Date
Status
Alfred
June 7 – July 22
Completed
Burns
June 7 – July 22
Completed
Churchill
June 20 – August 26
Work in progress
Spring Garden
May 24 – September 26
Work in progress
Sunshine (Forest to Sunnydale)
June 20 – August 26
Work in progress
Sunnydale
June 20 – August 26
Work in progress

Lining of water mains

Street
Date
Status
Anselme-Lavigne (Baderwood to Gariépy)
June 20 – July 29
Completed
Algonquin
June 1 – July 29
Completed
Bellerose
August 8 – October 6
Work in progress
Beaufort (Anselme-Lavigne to Fairlawn)
June 15 – July 25
Completed
Brentwood (Anselme-Lavigne to Willowdale)
June 15 – July 25
Completed
Buttonwood (Anselme-Lavigne to Willowdale)
June 15 – July 25
Completed
Dauphin B (Fairview Heights)
June 1- August 31
Completed
Huron (Mayfair to Roosevelt)
August 8 – October 6
Work in progress
Mansfield
June 1 – August 31
Completed
Mayfair
August 8 – October 6
Work in progress
Servitude (Dubois to Forest)
June 10 – July 20
Completed
Woodridge
June 1 – July 29
Completed

Flushing of fire hydrants

Street
Date
Status
Flushing – City wide – see plan
July 4 – September 2
Work in progress

Water main replacements

Street
Date
Status
Baderwood
August 22 to October 28
Work in progress

Collector sewer rehabilitation and reconstruction (Work done by the City of Montréal)

Street
Date
Status
Lake (Manuel to Westpark)
June 13 to July 20
Completed

Sewer main replacements

Street
Date
Status
Several streets
August 22 to October 28
Work in progress

Installation of a new exercise facility at Centennial Park

Street
Date
Status
Installation of a new exercise facility at Centennial Park
October 1, 2021 to spring 2022
Completed

If you live on one of these streets and have an automatic sprinkler system, a swimming pool backwash pipe or any other object buried at less than 3 meters (10 feet) from the curb or sidewalk, please advise Urban Planning and Engineering Department at 514-684-1010. Please take note that if the City has not been advised and damages do occur, the City cannot be held responsible.

If you would like to widen your driveway or change its location, please advise us as soon as possible

Questions ?

Contact Urban Planning and Engineering Department 514- 684-1010

Boil water advisory in effect in the DDO territory